SIL workshop takes almost half of the SIL building and also considered as the biggest and most important department which provides both the area and tools (or machinery) that may be required for the manufacture or repair of manufactured goods. Our workshops are the places of production of SIL local products.

Planning and timing is our main concern, with a proper and good planning, the production can be much more effective.

We have also set a limit for each products production. We are able to produce a 4500 Digester in 4 weeks time including finishing and QC check. SIL single barrel can be completed in 4 weeks time including finishing and coupling (ready unit), according to ISO 9001:2008 standard of quality assurance.